This project involved the full mechanical services installation for a new rooftop bar and restaurant, including associated enabling works to support the development.
Our scope of works included:
These works were carefully coordinated to integrate with existing hotel operations while delivering modern, efficient building services to support the new rooftop facility.
As part of the wider scheme, refurbishment works were undertaken to enhance the en-suite facilities within a number of hotel bedrooms, delivering refreshed, contemporary amenities for guests.
Our works included:
The completed works provide upgraded, high-quality bathroom facilities aligned with the hotel’s standards and guest experience objectives.


The Lockermarsh project involved the complete electrical redevelopment of a former care home, transforming it into a modern Care First Trust facility. The refurbished building now provides high-quality accommodation and educational spaces for foster children, supporting both residential and learning needs within a safe and nurturing environment.
Our team was responsible for delivering a comprehensive electrical installation package, completed within strict budget and programme requirements while maintaining the highest standards of quality, safety, and performance.
Scope of Works Included:

The Premier Inn Fulham project involved the comprehensive electrical fit-out of the ground floor within an existing hotel, supporting its redevelopment and transition into the new brand identity.
Our team delivered all electrical aspects of the refurbishment, ensuring the upgraded space met the required operational standards, brand specifications, and performance expectations.
The key focus within the project was the lighting control scheme.

This project comprised a comprehensive upgrade of the school’s heating infrastructure and domestic hot water generation systems. The existing, redundant plant and associated distribution systems were removed and replaced with modern, energy-efficient equipment to improve reliability, performance, and control.
The completed works provide the school with a modern, efficient, and fully controlled heating and hot water system designed to meet current operational demands while improving overall system performance and reliability.

This Leisure Centre refurbishment project involved upgrading the existing facility to deliver modern, high-quality amenities. The works included the creation of new shower and changing facilities, new WC facilities, a new soft play area, and the development of a new gymnasium and fitness studio.
Our scope of works included: